PPN 006 applies to suppliers bidding for in-scope central government contracts above £5m a year. [VERIFY — threshold and in-scope bodies to be confirmed by GGE] You need a published Carbon Reduction Plan covering Scopes 1 and 2 and a defined subset of Scope 3, confirming a net zero commitment by 2050 at the latest, board approved and on your website at the point of bidding.
The facts, in one table
| Who it applies to | Suppliers bidding for qualifying central government contracts [VERIFY] |
|---|---|
| What you must publish | A Carbon Reduction Plan in the prescribed template: baseline year and emissions, current year emissions, net zero commitment date, completed and planned reduction measures |
| Scope coverage | Scopes 1 and 2 in full, plus Scope 3 categories: business travel, employee commuting, upstream transport and distribution, waste, and downstream transport [VERIFY] |
| Sign-off | Board or equivalent approval, with a named signatory and a date |
| Where it goes | Published on your own website, and refreshed at least annually |
| If you do not have one | The bid is non-compliant and is not evaluated. There is no remedy mid-tender. |
The part that decides whether it is any good
A compliant plan and a competitive plan are different documents. The template sets a floor: a baseline, a date and a list. What separates the plans that score from the plans that merely pass is whether the reduction measures are specific, costed and sequenced — a named measure, with its expected saving in tonnes and in pounds, and the year it lands.
Evaluators read a lot of these. A plan promising to "explore opportunities for renewable energy" is scored exactly as it reads.
Where it goes wrong
- Announcing the date before measuring the baseline. The commitment then has to be defended with no evidence behind it, or quietly revised.
- Leaving out the required Scope 3 categories. The five named categories are not optional and their omission is the most common compliance failure.
- Writing it the week of the deadline. A baseline cannot be assembled in a week, and it shows.
- Never updating it. A plan with a two-year-old current-year figure signals the opposite of what it was meant to signal.
What a good one is worth
We wrote the Carbon Reduction Plan behind the largest single tender a client of ours has won — £14m, Wynne Construction. The plan did not win the bid on its own. It did mean the bid was not marked down on the one criterion that is entirely within a supplier's control.
See the report · What a credible net zero target looks like
Start before the tender, not during it
The sequence is measure, then plan, then commit, then publish. Compressed into a bid window it is expensive and the result scores badly.
Book the free half-day workshop and we will establish your baseline position and what the plan needs to say.