Skip to main content
Net zero & ESG consultants · Worcester, operating UK‑wide 01905 935 016 · info@gogreenexperts.co.uk
Book your free workshop
  1. Home
  2. Compliance
  3. Carbon Reduction Plan

Needed before you bid, not after

Carbon Reduction Plan (PPN 006)

To bid for qualifying central government contracts you must publish a Carbon Reduction Plan: a measured baseline, a net zero commitment date, and the specific measures you are taking. No plan, no bid.

Obligation page Last reviewed November 2026 Reviewer to be named before launch

Does it apply to you?

PPN 006 applies to suppliers bidding for in-scope central government contracts above £5m a year. [VERIFY — threshold and in-scope bodies to be confirmed by GGE] You need a published Carbon Reduction Plan covering Scopes 1 and 2 and a defined subset of Scope 3, confirming a net zero commitment by 2050 at the latest, board approved and on your website at the point of bidding.

The facts, in one table

Who it applies to Suppliers bidding for qualifying central government contracts [VERIFY]
What you must publish A Carbon Reduction Plan in the prescribed template: baseline year and emissions, current year emissions, net zero commitment date, completed and planned reduction measures
Scope coverage Scopes 1 and 2 in full, plus Scope 3 categories: business travel, employee commuting, upstream transport and distribution, waste, and downstream transport [VERIFY]
Sign-off Board or equivalent approval, with a named signatory and a date
Where it goes Published on your own website, and refreshed at least annually
If you do not have one The bid is non-compliant and is not evaluated. There is no remedy mid-tender.

The part that decides whether it is any good

A compliant plan and a competitive plan are different documents. The template sets a floor: a baseline, a date and a list. What separates the plans that score from the plans that merely pass is whether the reduction measures are specific, costed and sequenced — a named measure, with its expected saving in tonnes and in pounds, and the year it lands.

Evaluators read a lot of these. A plan promising to "explore opportunities for renewable energy" is scored exactly as it reads.

Where it goes wrong

  • Announcing the date before measuring the baseline. The commitment then has to be defended with no evidence behind it, or quietly revised.
  • Leaving out the required Scope 3 categories. The five named categories are not optional and their omission is the most common compliance failure.
  • Writing it the week of the deadline. A baseline cannot be assembled in a week, and it shows.
  • Never updating it. A plan with a two-year-old current-year figure signals the opposite of what it was meant to signal.

What a good one is worth

We wrote the Carbon Reduction Plan behind the largest single tender a client of ours has won — £14m, Wynne Construction. The plan did not win the bid on its own. It did mean the bid was not marked down on the one criterion that is entirely within a supplier's control.

See the report · What a credible net zero target looks like

Start before the tender, not during it

The sequence is measure, then plan, then commit, then publish. Compressed into a bid window it is expensive and the result scores badly.

Book the free half-day workshop and we will establish your baseline position and what the plan needs to say.

The report that helped Wynne win £14m.

Measured baseline, named measures, costed and sequenced, written to the criteria it was actually scored against.