Skip to main content
Net zero & ESG consultants · Worcester, operating UK‑wide 01905 935 016 · info@gogreenexperts.co.uk
Book your free workshop
  1. Home
  2. Compliance
  3. ESOS Phase 4

Notification due 5 December 2027 [VERIFY] — plenty of time to do it properly

ESOS Phase 4

The Energy Savings Opportunity Scheme requires large UK undertakings to audit their energy use every four years and report what they intend to do about it. Phase 4 is the one being prepared for now.

Obligation page Last reviewed November 2026 Reviewer to be named before launch

Does it apply to you?

ESOS catches a UK undertaking that, on the qualification date, has 250 or more employees, or a turnover above £44m and a balance sheet total above £38m. [VERIFY — figures to be confirmed by GGE] If any UK group company qualifies, the whole UK group is normally caught. Charities and the public sector are generally out of scope unless they trade.

The facts, in one table

Who it applies to Large UK undertakings meeting the employee or financial threshold on the qualification date [VERIFY]
What you must do Audit at least 95% of total energy consumption, identify cost-effective savings, and have it signed off by a lead assessor and a board director
Deadline Notification of compliance by 5 December 2027 [VERIFY]
Frequency Every four years
Regulator The Environment Agency, as UK scheme administrator
If you miss it Civil penalties for failing to notify, failing to audit, and for false statements, with publication of non-compliance [VERIFY — current penalty levels]

What Phase 4 actually involves

  1. Establish whether you qualify. Measured on the qualification date, against the whole UK group, not the individual trading entity.
  2. Measure total energy consumption. Buildings, transport and industrial processes across the four-year period, in kWh.
  3. Audit 95% of it. Site surveys, data analysis and the identification of cost-effective energy saving opportunities, each with an estimated saving and payback.
  4. Appoint a lead assessor to review and sign off the assessment, unless you are covered entirely by ISO 50001.
  5. Board sign-off. A director must confirm the assessment is accurate.
  6. Notify the Environment Agency before the deadline, and keep an evidence pack supporting everything in it.
  7. Publish an action plan setting out which of the identified measures you intend to take, and report progress against it annually. [VERIFY — action plan and annual progress requirements]

Where organisations get caught out

  • Leaving it to the final quarter. Lead assessor capacity disappears in the months before a deadline, and site surveys cannot be compressed. This is the single most common and most expensive mistake.
  • Forgetting transport. Fleet and grey fleet energy counts toward total consumption and is routinely omitted from the first estimate.
  • Assuming ISO 50001 covers everything. It only removes the ESOS audit obligation for the parts of the organisation actually inside the certified scope.
  • Group structure. One qualifying entity pulls in the rest of the UK group, including the parts that would never qualify alone.
  • Treating it as a filing exercise. The audit identifies costed savings. Organisations that act on them recover the cost of compliance and then some; organisations that file and forget have simply bought a certificate.

ESOS alongside your other obligations

ESOS rarely arrives alone. The energy data behind an ESOS assessment is most of the data behind a SECR disclosure, and the identified measures are most of a Carbon Reduction Plan under PPN 006. Organisations that run the three as one exercise spend materially less than those that commission them separately a few months apart.

See how the five regimes overlap, or check which ones apply to you.

Common questions

We qualified for Phase 3. Do we automatically qualify for Phase 4?

No. Qualification is re-tested on each phase's qualification date. An organisation that has shrunk below the threshold may fall out, and one that has grown may be caught for the first time.

Can we use our existing carbon footprint?

Partly. A GHG Protocol inventory gives you consumption data in a usable form, but ESOS requires an energy audit identifying cost-effective opportunities, which is a different deliverable. The data collection overlaps; the output does not.

Do we need a lead assessor if we have ISO 50001?

Not for the parts of the organisation inside the certified scope. Anything outside it still needs auditing and sign-off.

What does it cost?

It depends almost entirely on the number of sites and the state of your energy data. The free half-day workshop establishes both before anyone quotes anything.

Start it in the quiet part of the cycle

There is no advantage to being early except the obvious one: assessor availability, survey scheduling, and the chance to act on the savings during the compliance period rather than after it.

Book the free half-day workshop and we will tell you whether you qualify, what data you already hold, and what the gap looks like.

A 100% compliance record, and no client has ever filed late.

We run ESOS, SECR and PPN 006 as one exercise off one evidence pack, which is why it costs less than running them separately.